E 100

« Back to List« Go to the Germany Tech Tree
6 100 000
E 100
In June 1943, the Adlerwerke company received an order for development of the E 100. However, in 1944, heavy tank development was discontinued. By the end of the war, only the chassis was completed, which was later captured by the British Army.

12.8 cm Kw.K. Ausf. E

E 100

15 cm Kw.K. L/38

10WSc

Maybach Neues Projekt

E 100

Shell Types:

AP
APCR
HE
AP
HEAT
HE

Equipment:

Consumables:

Tech Tree:

E 75
154 000
E 100
183 010

Firepower:

Ammunition72 (rounds)
Caliber128 (mm)
Damage530 / 530 / 670 (HP)
Penetration246 / 311 / 65 (mm)
Rate of Fire5.00 (rounds/min)
Average Damage per Minute2650 (HP)
Shells in the Magazine  
Time for Loading Between Shots  (s)
Time for Complete Loading  (s)
Gun Loading12.00 (s)
Aiming Time2.50 (s)
Dispersion at 100 m0.39 (m)

Mobility:

Weight/Load Limit129.69 / 150.00 (t)
Engine Power1200 (h.p.)
Specific Power9.25 (h.p./t)
Top Speed30 (km/h)
Reverse Speed15 (km/h)
Traverse Speed22 (deg/s)
Turret Traverse Speed20 (deg/s)

Survivability:

Hit Points2700 (HP)
Hull Armor200 / 120 / 150 (mm)
Turret Armor270 / 150 / 150 (mm)

Spotting:

View Range400 (m)
Signal Range720 (m)
 

Crew:

Commander
Gunner
Driver
Radio Operator
Loader
Loader